| Job Description: |
Replace the existing SR 105 (Heckscher Drive) Bridge over Shad Creek. Work includes reconstruction of approximately 0.41 miles of roadway, removal of the existing bridge structure, 3,700 of prestressed concrete pile, 3,900 sf of permanent retaining wall, 2,400 sf of temporary retaining wall, 1,900 lf of prestressed concrete beams and 900 cy concrete.
|